Drops Design logo

Midsummer



Knitted DROPS shoulder piece with lace pattern in ”BabyMerino” and ”Kid-Silk”. Size: S - XXXL.

DROPS Extra 0-1276
DROPS design: Pattern no bm-027
Yarn group A + A or C
----------------------------------------------------------
Size: S/M - L/XL - XXL - XXXL
Materials:
DROPS BABY MERINO from Garnstudio
150 g for all sizes in colour no 02, off white
and use:
DROPS KID-SILK from Garnstudio
50-50-50-75 g colour no 01, off white

DROPS STRAIGHT NEEDLES OR CIRCULAR NEEDLE (60 cm) SIZE 5 mm – or size needed to get 17 sts x 22 rows in stocking st with 1 strand of each yarn = 10 x 10 cm.

GARTER ST (back and forth):
K all rows. 1 ridge = 2 rows K.

MOSS ST (back and forth):
Row 1: * K 1, P 1 *, repeat from *-*.
Row 2: K over P and P over K. Repeat 2nd row.

PATTERN:
See diagrams A.1 to A.6. The diagrams show all rows in pattern seen from RS.
----------------------------------------------------------

SHOULDER PIECE:
Worked back and forth on needle.
Cast on 109-115-127-139 sts on straight needles or circular needle size 5 mm with 1 strand Baby Merino and 1 strand Kid-Silk (= 2 strands). Work in MOSS ST - see explanation above. When piece measures 3 cm, work according to diagram A.1-A.2 as follows: Work 2 edge sts in moss st, repeat A.1 17-18-20-22 times, A.2 over 3 sts and 2 edge sts in moss st (work edge st in moss st the entire piece). Work diagram 3-4-5-6 times in total vertically. REMEMBER THE KNITTING TENSION

Now work 2 ridges in GARTER ST - see explanation above, AT THE SAME TIME cast on new sts in each side as follows: Work 1 ridge, on next ridge cast on 10 new sts at the end of every row = 129-135-147-159 sts.

Then work as follows: Work 2 edge sts in moss st, A.3 over 5 sts, repeat A.4 19-20-22-24 times, A.5 over 6 sts and 2 edge sts in moss st. Work diagram 1 time vertically.

Work 2 ridges, and work 2 rows in stocking st. Work according to diagram A.6 as follows: Work 2 edge sts in moss st, 2-5-5-5 sts in stocking st, repeat A.6 10-10-11-12 times, 3-6-6-6 sts in stocking st and 2 edge sts in moss st. Work diagram 3-4-3-4 times in total vertically. Work 2 rows in stocking st and then 2 ridges.

Work diagram A.3-A.5 as follows: Work 2 edge sts in moss st, A.3 over 5 sts, repeat A.4 19-20-22-24 times, A.5 over 6 sts and 2 edge sts in moss st. Work diagram 1 time vertically.

Now work 2 ridges, AT THE SAME TIME cast off sts in each side as follows: Work 1 ridge, on next ridge cast off the first 10 sts at the beg of every row = 109-115-127-139 sts.

Work diagram A.1-A.2 as follows: Work 2 edge sts in moss st, repeat A.1 17-18-20-22 times, A.2 over 3 sts and 2 edge sts in moss st. Work diagram 3-4-5-6 times in total vertically. Then work moss st for 3 cm. Loosely cast off.

ASSEMBLY:
Sew side and seam under sleeves in one in front loop of outermost st - see dotted line on chart.

Diagram explanations

K from RS, P from WS
= K from RS, P from WS
P from RS, K from WS = P from RS, K from WS
1 YO between 2 sts = 1 YO between 2 sts
K 2 tog = K 2 tog
slip 1 st as if to K, K 1, psso = slip 1 st as if to K, K 1, psso
slip 1 st as if to K, K 2 tog, psso = slip 1 st as if to K, K 2 tog, psso
Diagram for DROPS Extra 0-1276
Diagram for DROPS Extra 0-1276
Diagram for DROPS Extra 0-1276

Have you finished this pattern?

Tag your pictures with #dropspattern or submit them to the #dropsfan gallery.

Do you need help with this pattern?

You'll find 16 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com.
Have you purchased DROPS yarn to make this pattern? Then you are entitled to receive help from the store that sold you the yarn.


© 1982-2026 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site.