Drops Design logo

Coffee Ridge Vest

#coffeeridgevest



Knitted vest in DROPS Merino Extra Fine. The piece is worked bottom up with moss-stitch rib, garter stitch and V-neck. Sizes S - XXXL.

DROPS 257-4
DROPS Design: Pattern me-289
Yarn group B
-------------------------------------------------------

SIZES:
S - M - L - XL - XXL – XXXL

YARN:
DROPS MERINO EXTRA FINE from Garnstudio (belongs to yarn group B)
300-350-400-400-450-500 g colour 51, double latte.

BUTTONS:
DROPS BUTTONS NO 511: 3-3-4-4-4-4 items.

NEEDLES:
DROPS CIRCULAR NEEDLE SIZE 4 MM: Length 80 cm.

KNITTING TENSION:
21 stitches in width and 42 rows in height, with garter stitch on needle size 4 mm = 10 x 10 cm.
23 stitches in width and 36 rows in height, with moss-stitch rib on needle size 4 mm = 10 x 10 cm.
NOTE: Needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get too few stitches on 10 cm, change to a smaller needle size.

-------------------------------------------------------

EXPLANATIONS FOR THE PATTERN:

-------------------------------------------------------

GARTER STITCH (worked back and forth):
Knit all rows, from both the right and wrong side.
1 ridge in height = knit 2 rows.

INCREASE TIP:
INCREASE 1 STITCH TOWARDS LEFT:
Use the left needle to pick up the strand between 2 stitches from the previous row, pick up the strand from the front and knit through the back loop.
INCREASE 1 STITCH TOWARDS RIGHT:
Use the left needle to pick up the strand between 2 stitches from the previous row, pick up the strand from the back and knit through the front loop.

BUTTONHOLES:
Work the buttonholes on the right band from the right side (band = 6 stitches).
ROW 1 (right side): Knit together the 3rd and 4th stitches from the edge, make 1 yarn over, finish the row as before.
ROW 2 (wrong side): Work the band as before, knit the yarn over to leave a hole.
The first buttonhole is worked when the piece measures 10-10-9-10-10-10 cm. Then work the other buttonholes when the piece measures:
S: 19 and 28 cm
M: 19 and 28 cm
L: 16, 23 and 30 cm
XL: 17, 24 and 31 cm
XXL: 18, 26 and 34 cm
XXXL: 19, 28 and 37 cm
(the last buttonhole is worked before starting to decrease for the V-neck).

-------------------------------------------------------

START THE PIECE HERE:

-------------------------------------------------------

VEST - SHORT OVERVIEW OF THE PIECE:
The piece is worked back and forth from mid-front and bottom up as far as the armholes.
Then the piece is divided and the front and back pieces are finished separately.
If there is a «0» in your chosen size, skip the information and go straight to the next instruction.

BODY:
Cast on 175-192-210-228-256-278 stitches with circular needle size 4 mm and DROPS Merino Extra Fine.
Work 4 ridges – see GARTER STITCH in explanations above (= 8 rows).
Work the next row from the right side as follows:
Work 6 band-stitches in garter stitch, knit until there are 6 stitches left on the row AT THE SAME TIME increasing 16-17-19-21-23-27 stitches across these stitches, 6 band-stitches in garter stitch = 191-209-229-249-279-305 stitches.
Now work pattern as follows from the wrong side:
6 band-stitches as before, moss-stitch rib (purl 1, 1 garter stitch) until there are 7 stitches left, purl 1, 6 band-stitches as before.

Continue with garter stitch and moss-stitch rib (1 stocking stitch, 1 garter stitch) and begin increasing inside 7 stitches on each side - read INCREASE TIP, as follows:
ROW 1 (right side): Work 6 band-stitches as before, knit 1, increase 1 stitch towards the left, continue the moss-stitch rib (i.e., all stitches knitted from the right side) until there are 7 stitches left, increase 1 stitch towards the right, knit 1, 6 band-stitches as before (= 2 increased stitches). The increased stitches are worked in moss-stitch rib onwards.
ROW 2 (wrong side): 6 band-stitches as before, purl 2, moss-stitch rib (1 garter stitch, purl 1) until there are 8 stitches left, purl 2, 6 band-stitches as before.
ROW 3 (right side): Same as ROW 1.
ROW 4 (wrong side): 6 band-stitches as before, purl 1, work moss-stitch rib (1 garter stitch, purl 1) until there are 6 stitches left, 6 band-stitches as before.
Work ROWS 1-4 a total of 6 times (= 24 increased stitches) = 215-233-253-273-303-329 stitches.

Continue the moss-stitch rib and bands in garter stitch on each side – remember the BUTTONHOLES on the right band – read description above. Remember to maintain the knitting tension.

When the piece measures 22-23-24-25-26-27 cm, work as follows:
6 band-stitches as before, continue the moss-stitch rib across the next 45-47-51-55-61-67 stitches, work 11-17-19-21-23-25 garter stitches, continue the moss-stitch rib across the next 91-93-101-109-123-133 stitches, work 11-17-19-21-23-25 garter stitches, continue the moss-stitch rib across the next 45-47-51-55-61-67 stitches, 6 band-stitches as before.
When the piece measures 24-25-26-27-28-29 cm divide for the armholes.

DIVIDE FOR ARMHOLES:
On the next row from the right side, work 54-56-60-64-70-76 stitches as before (= band + front piece), cast off the next 5-11-13-15-17-19 stitches, work 97-99-107-115-129-139 stitches as before (= back piece), cast off the next 5-11-13-15-17-19 stitches, work the last 54-56-60-64-70-76 stitches as before (= front piece + band). On each side of the armholes there are 3 garter stitches. The front and back pieces are finished separately.

LEFT FRONT PIECE:
= 54-56-60-64-70-76 stitches.
From the wrong side: Continue the moss-stitch rib and garter stitch back and forth. AT THE SAME TIME on each row from the right side, decrease for the armholes as follows:
Work 3 garter stitches, slip 1 stitch, knit 1, pass the slipped stitch over the knitted stitch (= 1 stitch decreased), continue the moss-stitch rib until there are 6 stitches left, 6 band-stitches as before.
Decrease like this a total of 6-4-6-6-10-12 times (12-8-12-12-20-24 rows worked) = 48-52-54-58-60-64 stitches.

When the piece measures 28-28-30-31-34-37 cm, decrease for the V-neck on each row from the right side as follows:
Work as before until there are 8 stitches left, knit 2 together, 6 band-stitches as before (= 1 stitch decreased). Decrease like this a total of 18-20-20-22-24-26 times = 30-32-34-36-36-38 shoulder-stitches.
Continue working until the piece measures 45-47-49-51-53-55 cm. Now work diagonal shoulders as follows:

ROW 1 (right side): Cast off the first 8-8-8-9-9-10 stitches, work to end of row as before.
ROW 2 (wrong side): Work as before.
Work ROWS 1-2 a total of 3 times = 6-8-10-9-9-8 shoulder-stitches.
Cast off with knit from the right side. The vest measures approx. 47-49-51-53-55-57 cm from top of shoulder.

RIGHT FRONT PIECE:
= 54-56-60-64-70-76 stitches.
From the wrong side: Continue the moss-stitch rib and garter stitch back and forth. AT THE SAME TIME on each row from the right side, decrease for the armholes as follows:
Work as before until there are 5 stitches left, knit 2 together (= 1 stitch decreased), 3 garter stitches as before.
Decrease like this a total of 6-4-6-6-10-12 times (12-8-12-12-20-24 rows worked) = 48-52-54-58-60-64 stitches – remember the remaining BUTTONHOLES.

When the piece measures 28-28-30-31-34-37 cm, decrease for the V-neck on each row from the right side as follows:
Work 6 band-stitches as before, slip 1 stitch, knit 1 and pass the slipped stitch over the knitted stitch (= 1 stitch decreased), work to end of row as before. Decrease like this a total of 18-20-20-22-24-26 times = 30-32-34-36-36-38 shoulder-stitches.
Continue working until the piece measures 45-47-49-51-53-55 cm. Now work diagonal shoulders as follows:

ROW 1 (right side): Work as before.
ROW 2 (wrong side): Cast off the first 8-8-8-9-9-10 stitches, work to end of row as before.
Work ROWS 1-2 a total of 3 times = 6-8-10-9-9-8 shoulder-stitches.
Cast off with knit from the right side. The vest measures approx. 47-49-51-53-55-57 cm from top of shoulder.

BACK PIECE:
= 97-99-107-115-129-139 stitches.
Work as follows from the wrong side: Continue the moss-stitch rib, with 3 garter stitches on each side. AT THE SAME TIME decrease for the armholes on each row from the right side as follows:
Work 3 garter stitches, slip 1 stitch, knit 1 and pass the slipped stitch over the knitted stitch (= 1 stitch decreased), work as before until there are 5 stitches left, knit 2 together (= 1 stitch decreased), 3 garter stitches.
Decrease like this a total of 6-4-6-6-10-12 times (12-8-12-12-20-24 rows worked) = 85-91-95-103-109-115 stitches.
When the piece measures 43-45-47-49-51-53 cm, continue the pattern but now with garter stitch across the middle 37-39-39-43-49-51 stitches.

When the piece measures 45-47-49-51-53-55 cm, cast off the middle 21-23-23-27-33-35 stitches for the neckline and finish each shoulder separately.

SHOULDERS:
= 32-34-36-38-38-40 stitches.
Cast off 2 stitches on the next row from the neckline = 30-32-34-36-36-38 shoulder-stitches.
Then cast off for the diagonal shoulder at the beginning of each row from the shoulder as follows:
Cast off the first 8-8-8-9-9-10 stitches, work to the end of the row as before. Cast off like this a total of 3 times = 6-8-10-9-9-8 shoulder-stitches.
Cast off. The piece measures approx. 47-49-51-53-55-57 cm from top of shoulder.

ASSEMBLY:
Sew the shoulder seams, stitch to stitch along the diagonal shoulders (30-32-34-36-36-38 stitches on each seam). Sew the buttons onto the left band.

Diagram for DROPS 257-4

Have you finished this pattern?

Tag your pictures with #dropspattern #coffeeridgevest or submit them to the #dropsfan gallery.

Do you need help with this pattern?

You'll find 22 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com.
Have you purchased DROPS yarn to make this pattern? Then you are entitled to receive help from the store that sold you the yarn.


© 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site.