Drops Design logo

Dancing Diamonds

#dancingdiamondssweater



Knitted jumper in DROPS Baby Merino. The piece is worked top down with saddle-shoulders, lace pattern and ¾-length sleeves. Sizes S - XXXL.

DROPS 221-7
DROPS Design: Pattern no bm-086
Yarn group A
-------------------------------------------------------

SIZES:
S - M - L - XL - XXL - XXXL

MATERIALS:
DROPS BABY MERINO from Garnstudio (belongs to yarn group A)
250-300-300-350-400-400 g colour 24, light sky blue

KNITTING TENSION:
24 stitches in width and 32 rows in height with stocking stitch = 10 x 10 cm.

NEEDLES:
DROPS DOUBLE POINTED NEEDLES SIZE 3 MM.
DROPS CIRCULAR NEEDLE SIZE 3 MM: Length 40 cm and 80 cm for stocking stitch/pattern.
DROPS DOUBLE POINTED NEEDLES SIZE 2.5 MM.
DROPS CIRCULAR NEEDLE SIZE 2.5 MM: Length 40 cm and 80 cm for rib.
Needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get too few stitches on 10 cm, change to a smaller needle size.

-------------------------------------------------------

EXPLANATIONS FOR THE PATTERN:

-------------------------------------------------------

PATTERN: 
See diagram A.1. Choose diagram for your size.

INCREASE TIP-1 (evenly spaced):
To work out how to increase evenly, count the total number of stitches to be increased over (e.g. 14 stitches) and divide by the number of increases to be made (e.g. 5) = 2.8. 
In this example, increase by making 1 yarn over after approx each 3rd stitch. On the next round work the yarn overs twisted to avoid holes.

INCREASE TIP-2:
BEFORE THE MARKERS:
The new stitch twists to the right.
Use the left needle to pick up the back strand between 2 stitches from the previous round and knit in the front loop.
AFTER THE MARKERS:
The new stitch twists to the left.
Use the left needle to pick up the front strand between 2 stitches from the previous round and knit in the back loop.

INCREASE TIP-3 (for sides of body):
Work until there are 3-3-3-4-4-4 stitches left before the marker thread, 1 yarn over, knit 6-6-6-8-8-8 (the marker thread sits in the middle of these stitches), 1 yarn over (= 2 stitches increased). On the next round knit the yarn over twisted to avoid a hole. Then work the new stitch in stocking stitch. 

DECREASE TIP (for sides of body and sleeves): 
Decrease 1 stitch on each side of the marker thread as follows: Work until there are 4-4-4-5-5-5 stitches left before the marker thread, knit 2 together, knit 4-4-4-6-6-6 (the marker thread sits in the middle of these stitches), slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch (= 2 stitches decreased).

CASTING-OFF TIP:
To avoid the cast-off edge being tight you can cast off with a larger size needle. If the edge is still tight, make 1 yarn over after either each 3rd or each 6th stitch, at the same time as casting off; the yarn overs are cast off as normal stitches.

-------------------------------------------------------

START THE PIECE HERE:

-------------------------------------------------------

JUMPER – SHORT OVERVIEW OF THE PIECE:
The neck and yoke are worked in the round with circular needle, from mid back and top down. The yoke is divided for body and sleeves and the body is continued in the round with circular needle. The sleeves are worked with double pointed needles/short circular needle, top down.

NECK:
Cast on 114-114-126-140-146-146 stitches with circular needle size 2.5 mm and Baby Merino. Knit 1 round. Then work rib in the different sizes as follows:

Sizes S, M and L:
* Knit 1, purl 2 * work from *-* over the first 12-12-15 stitches, knit 1, purl 1 (= ½ back piece), work A.1a (choose diagram for your size) over the next 27-27-27 stitches (= right shoulder), purl 1, * knit 1, purl 2 *, work from *-* over the next 27-27-33 stitches, knit 1, purl 1 (= front piece), work A.1a over the next 27-27-27 stitches (= left shoulder), purl 1, * knit 1, purl 2 *, work from *-* over the next 15-15-18 stitches. Continue this rib in the round for 2 cm (A.1a is repeated in height).

Sizes XL, XXL and XXXL:
*Knit 1, purl 2 *, work from *-* over the first 18-18-18 stitches, knit 1, (= ½ back piece), work A.1a (choose diagram for your size) over the next 33-33-33 stitches (= right shoulder), * knit 1, purl 2 *, work from *-* over the next 36-39-39 stitches, knit 1 (= front piece), work A.1a over the next 33-33-33 stitches (= left shoulder), * knit 1, purl 2 *, work from *-* over the next 18-21-21 stitches. Continue this rib in the round for 2 cm (A.1a is repeated in height).

The next round is worked as follows:
Knit 14-14-17-19-19-19 stitches and increase 5-7-5-7-9-9 evenly over these stitches – read INCREASE TIP-1, work A.1a as before over the next 27-27-27-33-33-33 stitches, knit 30-30-36-37-40-40 stitches and increase 10-14-10-15-18-18 evenly over these stitches, work A.1a as before over the next 27-27-27-33-33-33 stitches, knit 16-16-19-18-21-21 stitches and increase 5-7-5-8-9-9 evenly over these stitches = 134-142-146-170-182-182 stitches. Change to circular needle size 3.

YOKE:
Insert 1 marker after 66-70-72-86-90-90 stitches (= approx. mid-front) – THE PIECE IS MEASURED FROM HERE!
In addition, insert 4 other markers as described below, without working the stitches and each marker is inserted between 2 stitches. The markers are used when increasing for the shoulders.
Marker 1: Start mid-back, count 19-21-22-26-28-28 stitches (= ½ back piece), insert the marker before the next stitch.
Marker 2: Count 27-27-27-33-33-33 stitches from marker 1 (= shoulder), insert the marker before the next stitch.
Marker 3: Count 40-44-46-52-58-58 stitches from marker 2 (= front piece), insert the marker before the next stitch.
Marker 4: Count 27-27-27-33-33-33 stitches from marker 3 (= shoulder), insert the marker before the next stitch.
There are 21-23-24-26-30-30 stitches left after marker 4 (= ½ back piece).
Allow the markers to follow your work onwards.

INCREASES FOR SADDLE SHOULDERS:
Read the whole section before continuing!
Continue working with A.1b over A.1a on the sleeves and stocking stitch on the front and back pieces.
AT THE SAME TIME on the first round increase 4 stitches for the shoulders as follows:
Increase BEFORE markers 1 and 3 and AFTER markers 2and 4 – read INCREASE TIP-2. You are only increasing on the front and back pieces, the number of stitches on the shoulders remain the same.
Continue the pattern and increase like this every round a total of 22-22-27-27-29-32 times = 222-230-254-278-298-310 stitches (the increased stitches are worked in stocking stitch). REMEMBER THE KNITTING TENSION!
After the last increase, the piece measures approx. 7-7-8-8-9-10 cm from the marker on the neck. Now increase for the sleeves as follows.

INCREASES FOR SLEEVES:
Continue the pattern. AT THE SAME TIME, on the next round, increase 4 stitches for the sleeves as follows:
Increase AFTER markers 1 and 3 and BEFORE markers 2 and 4 – remember INCREASE TIP-2.
You are only increasing on the shoulders and the number of stitches on the front and back pieces remains the same. The increased stitches are worked in stocking stitch.
Increase like this every 2nd round a total of 18-19-18-19-18-16 times = 294-306-326-354-370-374 stitches.
The piece measures approx. 18-19-19-20-20-20 cm from the marker on the neck.
Now increase for the yoke as follows.

INCREASES FOR YOKE:
Move the 4 markers so each one sits in the outermost stitch on each sleeve. There are 61-63-61-69-67-63 stitches between the marker-stitches on the sleeves.
On the next round, increase 8 stitches for the yoke by increasing both before and after all 4 marker-stitches – remember INCREASE TIP-2.
You are increasing on both the front and back pieces and on the sleeves and the increased stitches are worked in stocking stitch.
Increase like this every 2nd round a total of 1-4-4-5-7-9 times = 302-338-358-394-426-446 stitches.
When all the increases are finished, the piece measures approx. 18-20-22-23-25-27 cm from the marker on the neck. If the piece is shorter than this, continue working to the correct length.

Now divide the piece for body and sleeves on the next round as follows:
Work the first 42-47-50-56-61-65 stitches (= ½ back piece), place the next 65-73-77-85-89-91 stitches on a thread for the sleeve, cast on 12-12-16-18-20-22 stitches (= in side under sleeve), work the next 86-96-102-112-124-132 stitches (= front piece), place the next 65-73-77-85-89-91 stitches on a thread for the sleeve, cast on 12-12-16-18-20-22 stitches (= in side under sleeve), work the last 44-49-52-56-63-67 stitches (= ½ back piece). Body and sleeves are finished separately. THE PIECE IS NOW MEASURED FROM HERE.

BODY:
= 196-216-236-260-288-308 stitches. Insert 1 marker thread in the middle of the cast-on stitches under each sleeve. There are 98-108-118-130-144-154 stitches between the marker threads on the front and back pieces. Allow the threads to follow your work onwards; they are used when decreasing and increasing in the sides.
Continue in the round with stocking stitch.
When the piece measures 3 cm from the division, decrease 1 stitch on each side of both marker threads – read DECREASE TIP (= 4 stitches decreased). Decrease like this every 1½ cm a total of 5-5-5-5-5-5 times = 176-196-216-240-268-288 stitches. When the piece measures 11 cm from the division, increase 1 stitch on each side of both marker threads – read INCREASE TIP-3 (= 4 stitches increased). Increase like this every cm a total of 9-9-9-8-8-8 times = 212-232-252-272-300-320 stitches. When the piece measures 20 cm in all sizes (try the jumper on and work to desired length; there is approx 4 cm left to finished length), increase 13-14-15-16-18-19 stitches evenly spaced = 225-246-267-288-318-339 stitches. Change to circular needle size 2,5. Work rib (knit 1, purl 2) for 4 cm. Cast off with knit over knit and purl over purl - read CASTING-OFF TIP.
The jumper measures approx. 48-50-52-54-56-58 cm from the shoulder down.

SLEEVES:
Place the 65-73-77-85-89-91 stitches from the thread on the one side of the piece on double pointed needles/short circular needle size 3 mm and knit up 1 stitch in each of the 12-12-16-18-20-22 stitches cast on under the sleeve = 77-85-93-103-109-113 stitches. Insert a marker thread in the middle of the new stitches under the sleeve. Insert a marker thread in the middle of the new stitches under sleeve. Allow the thread to follow your work onwards; it will be used when decreasing under the sleeve.
Work pattern as before over the middle 27-27-27-33-33-33 stitches. The other stitches are worked in stocking stitch.
When the sleeve measures 3-3-3-3-2-2 cm, decrease 1 stitch on each side of the marker thread under the sleeve - read DECREASE TIP. Decrease like this every 3-2-1½-1-1-1 cm a total of 6-9-12-14-15-15 times = 65-67-69-75-79-83 stitches. When the sleeve measures 24-23-21-20-18-17 cm from the division, increase 2-3-4-4-3-5 stitches evenly over the stocking stitches (A.1b is continued as before) = 67-70-73-79-82-88 stitches. Change to double pointed needles size 2.5 mm and work A.1a over A.1B and rib over the other stitches (knit 1, purl 2). When the rib measures 3 cm, cast off with knit over knit and purl over purl. The sleeve measures approx. 27-26-24-23-21-20 cm from the division. Work the other sleeve in the same way.

Diagram explanations

knit = knit
purl = purl
between 2 stitches make 1 yarn over = between 2 stitches make 1 yarn over
knit 2 together = knit 2 together
slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch = slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch
slip 1 stitch as if to knit, knit 2 together and pass the slipped stitch over the knitted together stitches = slip 1 stitch as if to knit, knit 2 together and pass the slipped stitch over the knitted together stitches
increases for saddle shoulders = increases for saddle shoulders
increases for sleeves = increases for sleeves
increases for yoke = increases for yoke
Diagram for DROPS 221-7
Diagram for DROPS 221-7
Diagram for DROPS 221-7
Diagram for DROPS 221-7

Have you finished this pattern?

Tag your pictures with #dropspattern #dancingdiamondssweater or submit them to the #dropsfan gallery.

Do you need help with this pattern?

You'll find 31 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com.
Have you purchased DROPS yarn to make this pattern? Then you are entitled to receive help from the store that sold you the yarn.


© 1982-2025 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site.