Corrections to DROPS 77

Pattern 77-8

Updated online: 25.08.2023 (Printed catalogues do not include these corrections)

Correction ddc into tr.
Pattern 77-8

Pattern 77-11

Updated online: 10.01.2023 (Printed catalogues do not include these corrections)

Correction "Pattern: * 2 rows stockinette st, 1 row reverse stockinette st *, repeat from *-*"
Pattern 77-11

Pattern 77-13

Updated online: 20.04.2018 (Printed catalogues do not include these corrections)

updated diagram
Pattern 77-13

Pattern 77-15

Updated online: 24.04.2012 (Printed catalogues do not include these corrections)

Left front piece: ...When the piece measures 44-46-48-49-51 cm bind off 6-6-6-8-8 sts at the center front for the neck.
Pattern 77-15

Pattern 77-17

Updated online: 18.06.2018 (Printed catalogues do not include these corrections)

The required amount of Bomull-Lin for the jumper has been corrected. The name of the colours have also been updated
Pattern 77-17

Pattern 77-20

Updated online: 25.10.2016 (Printed catalogues do not include these corrections)

YOKE:
Continue with the rib as established - at the same time K 2 tog at each side of the 4 markers every row a total of 2 times (= 16 sts decreased) = 198-220-264-286 sts. When the piece measures 39-40-41-42 cm start yoke shaping.
Pattern 77-20