Corrections to DROPS 205

Pattern 205-7

Updated online: 27.01.2023 (Printed catalogues do not include these corrections)

The ribbing edge at the bottom of back and front piece has been edited into: 1 edge stitch in GARTER STITCH – read description above, * knit 1, purl 1 *, work from *-* until there is 1 stitch left on the row, finish with 1 edge stitch in garter stitch.
Pattern 205-7

Pattern 205-8

Updated online: 10.09.2019 (Printed catalogues do not include these corrections)

New diagram A.2 S-M-L-XL
Pattern 205-8

Pattern 205-11

Updated online: 25.03.2021 (Printed catalogues do not include these corrections)

RIGHT FRONT PIECE (when garment is worn): ... SIZE M: Work diagram A.16 over 5 stitches, work diagram A.17 until 2 stitches remain (= 9 times), work diagram A.18 over 1 stitch and work diagram A.19 over 1 stitch...
Pattern 205-11

Pattern 205-15

Updated online: 26.09.2019 (Printed catalogues do not include these corrections)

New pattern and new diagrams
Pattern 205-15

Pattern 205-16

Updated online: 26.09.2019 (Printed catalogues do not include these corrections)

New pattern and new diagrams.
Pattern 205-16

Pattern 205-18

Updated online: 12.08.2021 (Printed catalogues do not include these corrections)

Correction: The pattern has been looked over, the number of stitches on sleeves and body after the first raglan increase as been added. The diagrams A.2, A.3 og A.4 has be divided. And in addition a error when dividing for sleeves/body has been corrected.
Pattern 205-18

Pattern 205-20

Updated online: 26.03.2021 (Printed catalogues do not include these corrections)

SLEEVE, size XL: Corrections made in number of stitches, decreases and increases.
Pattern 205-20

Pattern 205-21

Updated online: 13.01.2022 (Printed catalogues do not include these corrections)

ELEVATION: ... turn, tighten strand and purl 72-78-84-90-90-96 stitches, turn, tighten strand and knit to end of row (edge stitches worked in garter stitch). Turn, purl 1 row across all stitches.
Pattern 205-21

Pattern 205-22

Updated online: 25.03.2021 (Printed catalogues do not include these corrections)

ELEVATION (in back of neck): ... turn, tighten strand and purl 72-78-84-90-90-96 stitches, turn, tighten strand and knit to mid back...
Pattern 205-22

Pattern 205-23

Updated online: 24.10.2024 (Printed catalogues do not include these corrections)

The pattern is updated. Correction under Raglan.
Pattern 205-23

Pattern 205-28

Updated online: 02.01.2023 (Printed catalogues do not include these corrections)

SLEEVE:... The next row is worked as follows – from the right side: 1 edge stitch in garter stitch, 2-3-4-4-5-6 stitches in stockinette stitch, A.4 (= 5 stitches), A.10 (= 26 stitches), A.6 (= 5 stitches), 2-3-4-4-5-6 stitches in stockinette stitch and 1 edge stitch in garter stitch. ..
Pattern 205-28

Pattern 205-31

Updated online: 25.03.2021 (Printed catalogues do not include these corrections)

Under YOKE: Increase before division and division for body and sleeves corrected.
Pattern 205-31

Pattern 205-32

Updated online: 25.03.2021 (Printed catalogues do not include these corrections)

Decrease TIP-2 corrected.
Pattern 205-32

Pattern 205-37

Updated online: 05.04.2024 (Printed catalogues do not include these corrections)

The pattern is updated. Correction under sleeve.
Pattern 205-37

Pattern 205-41

Updated online: 09.09.2022 (Printed catalogues do not include these corrections)

Symbols in diagram have been fixed.
Pattern 205-41

Pattern 205-46

Updated online: 07.03.2022 (Printed catalogues do not include these corrections)

LEFT + RIGHT SHOULDER FRONT: ... next 2-2-2-2-1-1 rows = 19-21-21-23-25-28 double crochets...
Pattern 205-46

Pattern 205-50

Updated online: 23.10.2019 (Printed catalogues do not include these corrections)

New text under chart icon for bobble.
Pattern 205-50