Corrections to DROPS 199

Pattern 199-1

Updated online: 18.03.2019 (Printed catalogues do not include these corrections)

Correction - YOKE: ... knit 1, make 1 yarn over, 24-26-26-28-30-32 stitches in pattern (= front piece)...knit 1, make 1 yarn over, work 24-26-26-28-30-32 stitches in pattern (= back piece)
Pattern 199-1

Pattern 199-1

Updated online: 30.08.2023 (Printed catalogues do not include these corrections)

RAGLAN: Increase 4 stitches in each transition between body and sleeves as follows: Work until there are 4 stitches left before the marker thread, 1 yarn over, knit 1, 1 yarn over, work 6 stitches in pattern (the marker thread sits in the middle of these 6 stitches), ...

Pattern 199-9

Updated online: 27.03.2019 (Printed catalogues do not include these corrections)

Instructions regarding assembly has been added.
Pattern 199-9

Pattern 199-12

Updated online: 27.05.2019 (Printed catalogues do not include these corrections)

Correction: missing decrease added to row 7 in diagram A.2 and A.4
Pattern 199-12

Pattern 199-14

Updated online: 24.06.2019 (Printed catalogues do not include these corrections)

Correction: Missing symbol added to the symbol definition (= 2 chain stitches)
Pattern 199-14

Pattern 199-14

Updated online: 08.06.2021 (Printed catalogues do not include these corrections)

No correction, but one line (last line) is added under CROCHET INFORMATION.

Pattern 199-14

Updated online: 07.09.2022 (Printed catalogues do not include these corrections)

1 slip stitch - the 2 slip stitches in A.1 row 9 are just for the start of the row.

Pattern 199-21

Updated online: 08.11.2023 (Printed catalogues do not include these corrections)

Correction in diagram A.8.
Pattern 199-21

Pattern 199-22

Updated online: 08.11.2023 (Printed catalogues do not include these corrections)

Correction in diagram A.8.
Pattern 199-22

Pattern 199-45

Updated online: 12.06.2019 (Printed catalogues do not include these corrections)

Correction: Decrease (alternately before and after the marker threads) every 2 cm = 3/4” 0-4-5-5-9-16 times and every cm = 3/8” 27-21-21-22-16-4 times (= a total of 27-25-26-27-25-20 decrease-rounds) = 156-164-184-204-236-256 stitches.
Pattern 199-45

Pattern 199-47

Updated online: 27.06.2019 (Printed catalogues do not include these corrections)

Correction - LEFT FRONT PIECE, ARMHOLE: Turn and work 1 double crochet in the 4th chain stitch from the hook (= 2 double crochets), work 1 double crochet in each of the next 1-1-2-3-4-4 chain stitches and work to end of row as before.
Pattern 199-47

Pattern 199-47

Updated online: 05.04.2024 (Printed catalogues do not include these corrections)

The pattern is updated. Correction on back piece.

Pattern 199-50

Updated online: 12.06.2019 (Printed catalogues do not include these corrections)

Correction - FRONT PIECE (bottom part): Work 1 double crochet in first stitch, work A.13 over 7 stitches, work A.14 over the next 56-70-70-84-98-98 stitches (= 4-5-5-6-7-7 repetitions of 14 stitches), work A.15 over 9 stitches and finish with 1 double crochet in last stitch. Continue until A.13 to A.15 have been worked vertically
Pattern 199-50