Corrections to DROPS 188

Pattern 188-1

Updated online: 18.04.2018 (Printed catalogues do not include these corrections)

Updated diagram
Pattern 188-1

Pattern 188-1

Updated online: 20.04.2018 (Printed catalogues do not include these corrections)

Updated diagram and updated the increase tip 1 section

Pattern 188-3

Updated online: 27.04.2018 (Printed catalogues do not include these corrections)

Added info about sewing the opening at front piece.
Pattern 188-3

Pattern 188-6

Updated online: 11.05.2018 (Printed catalogues do not include these corrections)

The length of the left and right front pieces, as well as the back piece were provided for 7 sizes, this has been corrected to 6 sizes
Pattern 188-6

Pattern 188-6

Updated online: 13.05.2022 (Printed catalogues do not include these corrections)

Corrections diagrams A.8 and A.9 so that the cables go in the correct direction.

Pattern 188-10

Updated online: 09.04.2018 (Printed catalogues do not include these corrections)

Correction: Assembly of the light pink front piece:... Sew the seam from the marker thread on the left side and all the way down to the cast-on edge on the back piece (= D – see sketch). Sew the seam from the marker thread on the right side and up to the marker thread inserted for armhole on the back piece...

Pattern 188-10

Pattern 188-10

Updated online: 29.01.2019 (Printed catalogues do not include these corrections)

Correction PINK FRONT PIECE: When the piece measures 40-42-45-47-51-54 cm = 15 3/4"-16 1/2"-17 3/4"-18 1/2"-20"-21 1/4" - adjust so that the next row is worked from the right side, insert a marker thread at the end of the row from the right side (used for assembly). Now bind off stitches at the beginning of each row from the wrong side as follows: ROW 1 (right side): knit all stitches. ROW 2 (wrong side): bind off 2 stitches, purl remaining stitches. ROW 3: knit all stitches. ROW 4: bind off 3 stitches, purl remaining stitches. Repeat rows 1-4 a total of 5-7-6-6-2-2 times, then bind off 2 stitches at the beginning of every row from the wrong side until all stitches have been bind off. Cut the strand and thread it through the last stitch on the needle. Correction - OFF WHITE FRONT PIECE: When the piece measures 40-42-45-47-51-54 cm = 15 3/4"-16 1/2"-17 3/4"-18 1/2"-20"-21 1/4" - adjust to match the other front piece and so that the next row is worked from the right side, insert a marker thread at the beginning of the row from the right side. Now bind off stitches at the beginning of each row from the right side as follows: ROW 1 (right side): bind off 2 stitches, knit remaining stitches. ROW 2 (wrong side): purl all stitches. ROW 3: bind off 3 stitches, knit remaining stitches ROW 4: purl all stitches. Repeat rows 1-4 a total of 5-7-6-6-2-2 times, then bind off 2 stitches at the beginning of every row from right side until all stitches have been bind off. Cut the strand and thread it through the last stitch on the needle.

Pattern 188-12

Updated online: 20.04.2018 (Printed catalogues do not include these corrections)

Updated diagram and updated the increase tip 1 section
Pattern 188-12

Pattern 188-20

Updated online: 29.05.2018 (Printed catalogues do not include these corrections)

Correction: The first row of the neck line is purled from the wrong side - previously purled from the right side
Pattern 188-20

Pattern 188-21

Updated online: 02.09.2019 (Printed catalogues do not include these corrections)

chart explanation on 1st and 2nd chart icon corrected.
Pattern 188-21

Pattern 188-27

Updated online: 09.04.2018 (Printed catalogues do not include these corrections)

Correction under PONCHO:...Now insert 6 markers from beginning of round as follows (without working): Insert 1 marker in 1st double crochet on round (i.e. in double crochet after the 3 chain stitches = mid back), skip 24-26-26 double crochets, insert 1 marker in next double crochet (= shoulder), skip 14 double crochets, insert 1 marker in next double crochet (= shoulder), skip 24-26-26 double crochets, insert 1 marker in next double crochet (= mid front), skip 24-26-26 double crochets, insert 1 marker in next double crochet (= shoulder), skip 14 double crochets, insert 1 marker in next double crochet (= shoulder), there are now 24-26-26 double crochets between last marker and beginning of round.

WORK A.1 AS FOLLOWS:
Work 1st round as follows: Work * A.1A in first/next double crochet with marker (= mid front/mid back), repeat A.1C 12-13-13 times in total, A.1D in next double crochet with marker (= shoulder increase), repeat A.1E 7 times in total, A.1D in next double crochet with marker (= shoulder increase), A.1E 12-13-13 times in total *, work from *-* 2 times in total.
Work 2nd round as follows: Work * A.1A (= mid front/mid back), A.1B, repeat A.1C 12-13-13 times in total, A.1D (= shoulder increase), repeat A.1E 7 times in total, A.1D (= shoulder increase), A.1E 12-13-13 times in total, A.1F *, work from *-* 2 times in total. Continue to and with 6th-7th-8th round in diagram A.1...

Pattern 188-27

Pattern 188-31

Updated online: 27.04.2018 (Printed catalogues do not include these corrections)

Added info about sewing the opening at front piece.
Pattern 188-31

Pattern 188-39

Updated online: 14.06.2018 (Printed catalogues do not include these corrections)

The required amount of yarn has been corrected to 450g Cotton Merino (Previously 300g) and 300g Sky (previously 200g)
Pattern 188-39

Pattern 188-40

Updated online: 09.03.2018 (Printed catalogues do not include these corrections)

New yarn amount in DROPS Kid-Silk DROPS KID-SILK from Garnstudio (belongs to yarn group A) 50-50-50 g colour 01, off white 50-50-75 g colour 03, light pink 50-50-75 g colour 04, medium pink
Pattern 188-40