Corrections to DROPS 178

Pattern 178-4

Updated online: 29.03.2017 (Printed catalogues do not include these corrections)

Sleeves has been corrected, new schematic drawing
Pattern 178-4

Pattern 178-15

Updated online: 10.07.2017 (Printed catalogues do not include these corrections)

YOKE:...cast on 6-8-10-12-12-14 new stitches under sleeve, work the next 67-71-79-83-93-95 stitches, slip stitches between 3rd and 4th marker thread on a stitch holder...
SLEEVE: …READ DECREASE TIP. Decrease like this every 4-3-2-2-2-2 cm/1½"-1"-3/4"-3/4"-3/4"-3/4" 6-7-10-11-11-11 times in total = 43-45-47-49-55-57 stitches
Pattern 178-15

Pattern 178-15

Updated online: 25.08.2017 (Printed catalogues do not include these corrections)

SLEEVE:...When sleeve measures 3 cm/1 inch from the new stitch cast on, decrease 1 stitch on each side of marker thread - READ DECREASE TIP. Decrease like this every 9th-7th-5th-4th-4th-4th round 6-7-10-11-11-11 times in total = 43-45-47-49-55-57 stitches (work the stitches that do not fit the pattern when decreasing in stocking stitch)... YOKE:...232-244-272-284-316-320 stitches on needle. Work next round as follows: Work until 1st marker thread, slip stitches between 1st and 2nd marker thread on a stitch holder (= 49-51-57-59-65-65 stitches for sleeve), cast on 6-8-10-12-12-14 new stitches under sleeve, work the next 67-71-79-83-93-95 stitches,...

Pattern 178-15

Updated online: 09.04.2019 (Printed catalogues do not include these corrections)

Correction - BODY: When piece measures 40-40-40-41-41-43 cm / 15 3/4"-15 3/4"-15 3/4"-16 1/8"-16 1/8"-17", increase 7-3-5-8-4-3 stitches evenly

Pattern 178-16

Updated online: 27.10.2017 (Printed catalogues do not include these corrections)

This pattern was been re-written in full.
Pattern 178-16

Pattern 178-16

Updated online: 28.08.2018 (Printed catalogues do not include these corrections)

Corrections have been made to sleeve cap: increased stitches are knit (previously purled) before being worked into A.2

Pattern 178-22

Updated online: 13.04.2017 (Printed catalogues do not include these corrections)

Text about diagram A.2 added: ...When A.1 has been worked 1 time vertically, work A.2 over A.1.
Pattern 178-22

Pattern 178-22

Updated online: 30.05.2024 (Printed catalogues do not include these corrections)

Text about diagram A.2 added: ...When A.1 has been worked 1 time vertically, work A.2 over A.1.

Pattern 178-26

Updated online: 29.05.2017 (Printed catalogues do not include these corrections)

RIGHT FRONT PIECE:...Now cast off for the neck at the beginning of every row from the wrong side: 9-9-11-9-11-8 stitches 1 time, 5 stitches 7 times and 2 stitches 1-1-1-2-2-4 times = 97-102-104-109-111-115 stitches...
Pattern 178-26

Pattern 178-31

Updated online: 21.04.2017 (Printed catalogues do not include these corrections)

Pattern and diagrams A.2 and A.3 has been updated.
Pattern 178-31

Pattern 178-31

Updated online: 27.04.2017 (Printed catalogues do not include these corrections)

Chart A.2 and A.3 - row 41 updated.

Pattern 178-32

Updated online: 04.04.2017 (Printed catalogues do not include these corrections)

On Yoke: Work after chart A.3, not A.4
Pattern 178-32

Pattern 178-32

Updated online: 21.04.2017 (Printed catalogues do not include these corrections)

Pattern and diagram A.2 has been updated.

Pattern 178-32

Updated online: 27.04.2017 (Printed catalogues do not include these corrections)

Chart A.2 (row 41 updated).

Pattern 178-47

Updated online: 19.02.2019 (Printed catalogues do not include these corrections)

Correction - XXXL: You increase a total of 34 times = 122 sts on front and back pieces
Pattern 178-47

Pattern 178-47

Updated online: 16.06.2023 (Printed catalogues do not include these corrections)

New diagram A.2

Pattern 178-48

Updated online: 18.09.2017 (Printed catalogues do not include these corrections)

ALL SIZES: Turn and work back and forth until the diagrams have been worked in height. Then work from the diagrams from the 2nd row 1 more time in height, AT THE SAME TIME on the last row adjust the number of stitches so that there will be 77-92-92-107 double crochets on row...
Pattern 178-48

Pattern 178-51

Updated online: 20.10.2017 (Printed catalogues do not include these corrections)

New yarn amount: DROPS NEPAL from Garnstudio 100-150-200 g colour 8908, aqua blue
Pattern 178-51

Pattern 178-52

Updated online: 24.05.2017 (Printed catalogues do not include these corrections)

The pattern was been updated to have info about how to work the pattern back and forth.
Pattern 178-52

Pattern 178-59

Updated online: 14.12.2023 (Printed catalogues do not include these corrections)

The pattern has been reviewed and updated. Correction under shoulderwarmer when A.1 starts.
Pattern 178-59

Pattern 178-62

Updated online: 24.05.2017 (Printed catalogues do not include these corrections)

Correction: Pattern has been updated with correct diagram numbers in pattern and in diagrams.
Pattern 178-62

Pattern 178-65

Updated online: 11.07.2017 (Printed catalogues do not include these corrections)

New chart A.1
Pattern 178-65

Pattern 178-74

Updated online: 02.08.2017 (Printed catalogues do not include these corrections)

Small edit in the bikini top.
Pattern 178-74