Corrections to DROPS 176

Pattern 176-2

Updated online: 09.03.2017 (Printed catalogues do not include these corrections)

The garments measurement at the chest has been added to the schematic : Choose your normal size. The chest measurement is wide, but the garment drapes nicely.
Pattern 176-2

Pattern 176-2

Updated online: 25.08.2017 (Printed catalogues do not include these corrections)

Diagrams A.2a, A.3a, A.3b and A.5a have been updated.

Pattern 176-5

Updated online: 15.09.2017 (Printed catalogues do not include these corrections)

JUMPER:...On the sleeve increase every 2nd row 22-26-29-31-32-33 times, on the body increase every row 0-0-0-0-0-6 times, then every 2nd row 14-16-17-25-32-30 times, and finally every 4th row 4-5-6-3-0-0 times.
Pattern 176-5

Pattern 176-9

Updated online: 15.09.2017 (Printed catalogues do not include these corrections)

JACKET:...On the sleeve increase every 2nd row 22-26-29-31-32-33 times, on the body increase every row 0-0-0-0-0-6 times, then every 2nd row 14-16-17-25-32-30 times, and finally every 4th row 4-5-6-3-0-0 times.
Pattern 176-9

Pattern 176-12

Updated online: 02.06.2017 (Printed catalogues do not include these corrections)

Diagram A.3 has been updated.
Pattern 176-12

Pattern 176-14

Updated online: 29.08.2017 (Printed catalogues do not include these corrections)

New yarn amount: DROPS AIR fra Garnstudio 400-450-500-550-650-700 g colour 03, pearl grey
Pattern 176-14

Pattern 176-16

Updated online: 21.02.2017 (Printed catalogues do not include these corrections)

There has been made a small edit in pattern text about diagram A.2B.
Pattern 176-16

Pattern 176-16

Updated online: 13.07.2017 (Printed catalogues do not include these corrections)

FIRST SECTION:
The round starts on the left shoulder.
Work 146-178-206 chain stitches with hook size 4 mm / G/6 and light beige and form them to a ring with 1 slip stitch in the first chain stitch.

Pattern 176-17

Updated online: 04.06.2018 (Printed catalogues do not include these corrections)

"The piece is now measured from here" has been added after stitches is set aside for sleeves
Pattern 176-17

Pattern 176-18

Updated online: 04.06.2018 (Printed catalogues do not include these corrections)

"The piece is now measured from here" has been added after stitches are set aside for sleeves
Pattern 176-18

Pattern 176-23

Updated online: 29.05.2018 (Printed catalogues do not include these corrections)

Correction: Instead of working all of A.1 once, diagram A.1 is worked until A.y has been completed. Repeat A.x and A.y 1 more time
Pattern 176-23

Pattern 176-25

Updated online: 21.02.2017 (Printed catalogues do not include these corrections)

Diagram A.2 has been edited.
Pattern 176-25

Pattern 176-26

Updated online: 24.05.2017 (Printed catalogues do not include these corrections)

A small edit in Diagram A.8.
Pattern 176-26

Pattern 176-26

Updated online: 29.08.2017 (Printed catalogues do not include these corrections)

Diagram A.5 row 24 has been updated.

Pattern 176-26

Updated online: 13.03.2023 (Printed catalogues do not include these corrections)

BACK PIECE:... On the next to last round in A.2, A.3 and A.4 (there are now 324-372-420 stitches on the round) work as follows: ...

Pattern 176-28

Updated online: 08.06.2017 (Printed catalogues do not include these corrections)

Diagram A.1 has been updated.
Pattern 176-28

Pattern 176-32

Updated online: 14.06.2024 (Printed catalogues do not include these corrections)

The pattern is updated. Updated explanations for decreases on body.
Pattern 176-32