Corrections to DROPS 146

Pattern 146-1

Updated online: 06.06.2014 (Printed catalogues do not include these corrections)

New yarnamount:
Materials: DROPS PARIS from Garnstudio
Colour no 26, dark beige:
600-650-700-800-850-900 g
Pattern 146-1

Pattern 146-2

Updated online: 06.08.2019 (Printed catalogues do not include these corrections)

FRONT PIECE: ....(= 29-32-35-39-42 inc and 60-66-72-80-86 sts on each of the 4 sides).
Pattern 146-2

Pattern 146-3

Updated online: 20.03.2014 (Printed catalogues do not include these corrections)

under ASSEMBLY:
Sew the 2 parts tog mid back.
Pattern 146-3

Pattern 146-5

Updated online: 14.09.2016 (Printed catalogues do not include these corrections)

New diagrams A.2, A.3, A.4 and A.5 (there were some yo's missing).
Pattern 146-5

Pattern 146-7

Updated online: 28.08.2013 (Printed catalogues do not include these corrections)

PATTERN:
See diagrams M.1, M.2, M.3, M.4 and M.5. The diagrams show the pattern from RS.
Diagram M.1 shows how to work the beg of shawl. M.2 and M.3 show how to repeat the pattern each side of the middle, M.4 and M.5 shows how to finish the pattern at the bottom of shawl.

SHAWL:...On next row from RS work diagram M.1 one time in height.
Then work as follows: 3 sts in garter st, diagram M.2A 1 time, diagram M.2B 2 times, diagram M.2C 1 time, K 1 (= mid st), diagram M.3A 1 time, diagram M.3B 2 times, finish with diagram M.3C and 3 sts in garter st.
Continue the pattern like this, but for each repeat of M.2/M.3 in height work M.2B/M.3B one extra time on each side of mid st with marker. When piece measures approx. 70 cm/ 27½'' in the middle (make sure to finish after last row in diagram M.2/M.3), work diagram M.4 on the right side of middle stitch seen from RS and M.5 on left side.
Work M.4/M.5 1 time vertically, then work in garter st over all sts for approx. 2 cm / 3/4'' (continue inc 4 sts every other row), LOOSELY bind off all sts. Now piece measures approx. 80 cm / 31½''.
Pattern 146-7

Pattern 146-7

Updated online: 06.12.2016 (Printed catalogues do not include these corrections)

Correction: New chart M.2

Pattern 146-17

Updated online: 25.02.2013 (Printed catalogues do not include these corrections)

New chart A.1 added (yo on row 47 was missing)
Pattern 146-17

Pattern 146-19

Updated online: 07.02.2017 (Printed catalogues do not include these corrections)

New yarn amount:
DROPS MELODY from Garnstudio
50-100-100 g colour no 01, off white
Pattern 146-19

Pattern 146-22

Updated online: 06.03.2013 (Printed catalogues do not include these corrections)

New text added for 3rd chart symbol: = 2 YOs between 2 sts, on next row work first YO P on RS or K from WS, and slip 2nd YO off the needle (i.e. do not work)
Pattern 146-22

Pattern 146-31

Updated online: 05.10.2016 (Printed catalogues do not include these corrections)

Then work A.1 as follows:
ROUND 1: ch 4 (counted as 1st dc and 1 ch), skip the first 3 dc, * work 1 DC-GROUP - read explanation above - in next dc, ch 1, skip the next 3 dc, 1 dc in next dc, ch 1, sk next 3 dc *, repeat from *-* the entire round, finish with 1 dc-group in next dc, 1 ch, 1 sl st in 3rd ch from beg of round = 10 dc-groups.
Pattern 146-31

Pattern 146-35

Updated online: 16.01.2014 (Printed catalogues do not include these corrections)

New yarn amount: Materials:
DROPS BIG MERINO from Garnstudio
950 (1100) g color no 01, off white
Pattern 146-35

Pattern 146-39

Updated online: 19.03.2013 (Printed catalogues do not include these corrections)

RIGHT SOCK:
...
After heel dec work as follows: 1 dc in each of the 13-15-15 sc on heel, 14-15-16 dc along the edge on heel, 1 dc in each of the 37-37-41 dc/ch on top of foot and 14-15-16 dc along the edge on the other side of heel = 78-82-88 dc on round.
Insert 1 marker on each side of the middle 33-37-37 dc on top of foot.
Then work in the round with dc under foot and A.1 over the 33-37-37 dc on top of foot while AT THE SAME TIME dec 1 dc on each side of the 33-33-37 sts on top of foot...
Pattern 146-39