Corrections to DROPS 136

Pattern 136-1

Updated online: 12.03.2012 (Printed catalogues do not include these corrections)

Materials: DROPS BABYALPACA SILK from Garnstudio
200-250-250 g color no 7219, pistachio
150-200-200 g color no 7402, light sea green
150-200-200 g color no 1760, light grey purple
100-100-100 g color no 3250, light old pink
100-100-100 g color no 4314, grey purple
Pattern 136-1

Pattern 136-1

Updated online: 27.03.2012 (Printed catalogues do not include these corrections)

STRIPES:...
Stripe 8: 1 strand light old pink and 1 strand gray purple
Stripe 9 until finished measurements: 2 strands gray purple
ASSEMBLY:...
Work 1 round around the entire body and at bottom of sleeves as follows with 2 strands gray purple:

Pattern 136-6

Updated online: 06.03.2012 (Printed catalogues do not include these corrections)

BACK PIECE:
1st row = WS (= last row in diagram M.1). Work sts from right front piece on to circular needle size 4 mm / US 6, cast on 34 new sts (= back of neck) and work sts from left front piece on to circular needle = 132-150-150-168 sts in total.
Continue with PATTERN as explained above, but work 4 rows in garter st over the 34 new sts before they are also included into pattern!
Pattern 136-6

Pattern 136-6

Updated online: 13.10.2016 (Printed catalogues do not include these corrections)

NECK EDGE: Knit up approx. 38-41 sts (from RS, incl sts on stitch holders) on circular needle size 4 mm along neckline of RIGHT FRONT PIECE until begin of BACK PIECE (= the 34 new stitches in garter st) . K 3 rows back and forth, then cast off. Repeat along LEFT FRONT PIECE.

Pattern 136-11

Updated online: 15.10.2013 (Printed catalogues do not include these corrections)

New chart M.3C has been published (a yo was missing on 9th row).
Pattern 136-11

Pattern 136-11

Updated online: 30.04.2020 (Printed catalogues do not include these corrections)

New chart M.3C (last YO was missing/misplaced)

Pattern 136-13

Updated online: 22.05.2012 (Printed catalogues do not include these corrections)

New chart X.1 has been published.
Pattern 136-13

Pattern 136-16

Updated online: 13.05.2013 (Printed catalogues do not include these corrections)

LEFT SLEEVE:
Work back and forth on circular needle size 3.5 mm/US 4 from mid under sleeve....

RIGHT SLEEVE:
With circular needle size 3.5 mm/US 4 start by picking up 1 st in each ....
Pattern 136-16

Pattern 136-17

Updated online: 15.10.2012 (Printed catalogues do not include these corrections)

LEFT FRONT PIECE:
...Switch to needle size 4 mm / US 6 and work in stockinette st with 2 sts in garter st towards the side and 2 sts in garter st towards mid front.
Pattern 136-17

Pattern 136-23

Updated online: 29.06.2012 (Printed catalogues do not include these corrections)

ROW 1:
...ROUND 4 (switch back to Safran): ch 2, 1 sc in first ch-space, * ch 4, 1 sc in next ch-space, ch 4, 1 sc in next ch-space, ch 8, 1 sc in next ch-space (= corner) *, ...
Pattern 136-23

Pattern 136-28

Updated online: 11.04.2012 (Printed catalogues do not include these corrections)

New chart text has been published
Pattern 136-28

Pattern 136-28

Updated online: 03.01.2017 (Printed catalogues do not include these corrections)

New yarn amount: DROPS LACE from Garnstudio 50 g colour no 0100, off white

Pattern 136-30

Updated online: 07.11.2016 (Printed catalogues do not include these corrections)

PATTERN 2 (also see diagram M.2)
ROW 5: 3 ch, skip 2 dc, * in next dc work 1 dc + 3 ch + 1 dc, skip 1 dc, 1 dc in each of the next 3 dc, skip 1 dc *, repeat from *-* until 4 dc remain, in next dc work 1 dc + 3 ch + 1 dc, skip 2 dc, 1 dc in 3rd ch from beg of previous row.
Pattern 136-30