Corrections to DROPS 121

Pattern 121-1

Updated online: 18.11.2010 (Printed catalogues do not include these corrections)

SLEEVE:
... K 2 rows on all sts, change to circular needle size 5.5 mm/US 9 and continue...
Pattern 121-1

Pattern 121-1

Updated online: 08.02.2011 (Printed catalogues do not include these corrections)

ENGLISH RIB ON BORDERS AND SLEEVES (back and forth on needle):
Row 1: 1 garter st, * K1, 1 YO, slip 1 st as if to P *, repeat from *-* until 2 sts remain, finish with K1, 1 garter st.
Work row 2 and 3 as described for body piece - see above! Repeat row 2 and 3.

Pattern 121-3

Updated online: 02.11.2010 (Printed catalogues do not include these corrections)

New chart M.4 B has been published
Pattern 121-3

Pattern 121-3

Updated online: 11.04.2013 (Printed catalogues do not include these corrections)

New chart M.5 has been published

Pattern 121-8

Updated online: 26.10.2010 (Printed catalogues do not include these corrections)

New numbers in measure chart, new chart has been published.
Pattern 121-8

Pattern 121-11

Updated online: 18.11.2010 (Printed catalogues do not include these corrections)

Materials: DROPS KID-SILK from Garnstudio
125-125-150-150-175-200 g
Pattern 121-11

Pattern 121-15

Updated online: 14.09.2010 (Printed catalogues do not include these corrections)

Rearranged chart symbols.
Pattern 121-15

Pattern 121-17

Updated online: 14.09.2010 (Printed catalogues do not include these corrections)

RIGHT FRONT PIECE:

...............AT THE SAME TIME when working the 8 rows back and forth on all sts:
from RS K tog the first 2 sts after marker, and repeat the dec on every 2nd-4th-4th row a total of 36-32-23 times.

...............AT THE SAME TIME when working the 8 rows back and forth on all sts, also work shortened rows to curve the front piece.

...............For each time the 8 rows are K back and forth on all sts continue these shortened rows after marker by working on 3 sts less each time until 3 sts remain.
Pattern 121-17

Pattern 121-17

Updated online: 17.11.2010 (Printed catalogues do not include these corrections)

NOW MEASURE PIECE FROM HERE!
... Continue with garter st and shortened rows in stockinette st on these sts as before, until collar measures 7-8-9 cm / 2 3/4"-3 1/8"-3½" where shortest. Bind off.

Pattern 121-26

Updated online: 26.08.2010 (Printed catalogues do not include these corrections)

Materials: DROPS SNOW from Garnstudio
950-1050-1150-1250-1400-1500 g color no 21, blue violet
Pattern 121-26

Pattern 121-27

Updated online: 07.10.2010 (Printed catalogues do not include these corrections)

Sleeve edge: ....K 3 rows and work next row as follows: bind off the first 3-3-4-4-5-5 sts, K sts on row until 3-3-4-4-5-5 sts remain, bind off these sts, cut the thread = 52-55-62-65-68-69 sts remain on needle.
Pattern 121-27

Pattern 121-27

Updated online: 12.10.2016 (Printed catalogues do not include these corrections)

YOKE: ...Now complete M.1. After M.1 there are 98-106-114-122-130-138 sts on needle. Work 1 row from WS. Change to circular needle size 4 mm...

Pattern 121-28

Updated online: 17.12.2011 (Printed catalogues do not include these corrections)

5th chart symbol has been corrected to: keep the yarn behind piece, slip 2 sts as if to K
Pattern 121-28

Pattern 121-29

Updated online: 10.03.2011 (Printed catalogues do not include these corrections)

New chart M.1 for S-M-L has been added.
Pattern 121-29